Shreehatta Economic Zone

Key Site Facts:

 Shreehatta Economic Zone  will be the first Public Private Partnership EZ in the Sylhet division encompassing an area of 352 acres

Location:

Sherpur within Maulovibazar Sadar Upazila of Moulovibazar District

Connectivity:

  • Road Connectivity: Located along the Dhaka-Sylhet highway, only 40 km away from Sylhet city and 208 km from Dhaka.
  • Rail Connectivity: Lies beside the Dhaka – Sylhet Rail link, a busiest rail track for passenger and freight transport. Shreemongol railway junction is only 35 km from the zone.
  • Air Connectivity: Osmani International Airport is only 55 km and Shahajalal International Airport 208 km from the zone.
  • Port Connectivity: Distance of Tamabil Land Port fromthe zone is only 100 km.
  • River : Direct access to Kushiara River.

Utilities:

Electricity:

  • Existing Capacity: 20 MW to be provided by Bangladesh Rural Electrification Board
  • A 33 KV dedicated line will be drawn from existing 132 KV Grid Substation located nearby

Telecommunication:

  • Mobile connectivity available
  • 1 km away from the Moulovibazar Telephone Exchange
  • Connected by FOC to the Moulovibazar main Exchange

 

Water Supply:

  • Surface water is available within 1 km from the zone
  • 6 MLD water line will be installed for piping water from Kusiara river

Industries can be set up :

  • Textiles (Spinning, weaving and dyeing)
  • Ceramics
  • Paint and glass making
  • Food Processing etc.

Offsite Infrastructure Facilities :

  • Access Road: Dhaka-Sylhet Highway runs through the zone
  • Site Development Works (land fill) : to be completed by December 2016
  • Boundary Wall: to be completed by December 2016
  • Administration building: Consisting of 1680 sq. m of built-up area with G+2 structures within the EZ to be built by March 2017
  • Power : 33 KVA dedicated electric line will be established for unit investors .
  • Gas : 14 MMCFD gas line to be completed by June 2016 through Jalalabad Gas Distribution Company
  • A F Fiber Optic Cable connection will be done by December 2016 through BTCL